Caulk v silicone sealant
Silicone is a man-made polymer that is derived from silicon. Silicone sealant is a flexible, adhesive, and resilient to moisture. Some varieties contain a fungicide to increase resistance to mould growth. However, it cannot be painted over. It is suitable for sealing against moisture penetration in bathrooms and kitchens, for example around baths and showers, sinks and so on. It can also be used as a sealant around external doors and windows.
Caulk is a filler material commonly used by decorators. It has a variety of compositions, including rope, acrylic, vinyl and silicone. Caulk is also adhesive and a good sealant. It dries more quickly than silicone sealant, and acrylic caulk can be painted over, but it is not as flexible once dry and it shrinks slightly on drying (meaning a second application may be necessary). This means that caulk is suitable for filling gaps when decorating, such as around skirting and built-in furniture where little movement is expected and over-painting may be required.
[edit] Related articles on Designing Buildings
Featured articles and news
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.